ISO 14001 / EMS Compliance Update - Reach Regulations Update
You Cannot Multitask!
Effective Multitasking is an oxymoron I have been well aware of for some time. My own personal experience has shown that we do not actually multitask we just switch from task to task, Interrupting ourselves and losing productivity in the process. In time management training we call this an interruption. I have also watched project managers, quality managers, supervisors and managers try to multitask regularly and significantly reduce their own productivity.
This is why in my time & project management training workshops I instruct participants to schedule blocks of time for items that might otherwise be multitasked such as updating project schedules and action item lists as well as scheduling planning time for each day.
If you are Multitasking, you are reducing your IQ twice as much as smoking Pot:
A study, carried out at the Institute of Psychiatry, found excessive use of technology reduced workers' intelligence - Those distracted by incoming email and phone calls saw a 10-point fall in their IQ - more than twice that found in studies of the impact of smoking marijuana, said researchers or about the same amount as not sleeping at all for an entire night.
How many tasks can we focus on effectively (1 or 2 maximum):
The pioneer of this research is Professor Earl Miller, a neuroscientist at the world-renowned Massachusetts Institute of Technology. He scanned volunteers’ heads while they performed different tasks and found that when there is a group of visual stimulants in front of you, only one or two things tend to activate your brain, indicating we’re really only focusing on
one or two items.
But I am working faster when I Multitask:
An American study reported in the Journal Of Experimental Psychology found that it took students far longer to solve complicated math problems when they had to switch to other tasks - in fact, they were up to 40 percent slower.
Ever wonder why you are grumpier or less satisfied when you try to multitask? (And this is over and above the items previously listed)
Studies by Gloria Mark, an ‘interruption scientist’ at the University of California, show that when people are frequently diverted from one task to another, they work faster, but produce less. After 20 minutes of interrupted performance, people report significantly higher stress levels, frustration, workload, effort and pressure.
So you work faster, but get less done and are more stressed!
But I Am Experienced and Good At Multitasking (Practice makes perfect):
This is a Misnomer – Research has actually proved that people who try to multitask a lot are actually less effective and efficient at it than people who do it once in a while (Cognitive control in media multitaskers - Edited by Michael I. Posner, University of Oregon, Eugene, OR, and approved July 20, 2009 (received for review April 1, 2009)
Aren’t Women supposed to be better at Multitasking than Men?
Incidentally, such research - like the bulk of scientific investigation into the brain - reveals no significant difference between the sexes. The widespread belief that women’s brains are
naturally better at multi-tasking seems to be a myth.
The evidence shows that women’s apparent multi-tasking superiority is down to the fact they are happier to try doing several things at once.
How about our Children?
Multitasking is actually bad for a child's intellectual development. This growing problem has been christened 'attention deficit trait' by psychiatrist Edward Hallowell. 'As our minds fill
with noise, the brain gradually loses its capacity to attend fully and gradually to anything,' he argues.
Such scatterbrained attention-swinging may be causing a form of autism among children growing up immersed in technology, affecting their ability to interact with others.
This should be a call to action to help our children learn to focus on individual task completion and to help them learn to cut out distractions
So what can I or should I do?
1. Turn off your e-mail alert
2. Check your e-mail at certain times during the day
3. Schedule important tasks and block out distractions during those times
4. Communicate with your team members and coworkers that there are certain times of the day when you're not to be disrupted unless it's an emergency (You need to do this in a tactful manner)
5. If the noise around you is distracting consider using earplugs
6. Reduce the duration of meetings. Ask participants to refrain from using smart phones or e-mail during the meeting and stay focused on the meeting agenda.
Here is an additional article from the Harvard Business Journal:
How (and Why) to Stop Multitasking:
http://blogs.hbr.org/bregman/2010/05/how-and-why-to-stop-multitaski.html
Process Improvement SPICE, ISO 15504, CMMI & SCRUM
Most people do not realize the complexity of developing software. Many current companies are producing software that is embedded in hardware. This software has grown exponentially over the past several years and while these same companies have the experience of building the associated hardware for many years, the embedded software processes are not as mature.
As the software has become more complex, many of the processes of requirements analysis and testing has, in many cases not kept pace. This results in a process of developing software that is not well controlled and leads to inconsistent results.
Some recent projects we have been working on have been to help companies improve their development processes for software and in achieving SPICE & CMMI Level 2 and Level 3.
While much of this article and examples are specific to software processes, the project management and control described below contains approaches and lessons for most companies and organizations.
Approaches,
Companies approach process improvement typically in two ways and most times a combination of both. One is a drive to improve processes to eliminate issues that reoccur and cause significant pain within the organization. The second is to meet requirements placed on the organization by their customers and contracts.
In either case a company should begin by addressing the process areas that are the bottlenecks and factors that limit the efficiency, effectiveness, and quality of their end product.
The areas we have been focusing on recently come from the Automotive SPICE Scope:
System requirements analysis (ENG.2)
System architectural design (ENG.3)
Software requirements analysis (ENG.4)
Software design (ENG.5)
Software construction (ENG.6)
Software integration (ENG.7)
Software testing (ENG.8)
System integration (ENG.9)
System testing (ENG.10)
Quality assurance (SUP.1)
Configuration management (SUP.8)
Problem resolution management (SUP.9)
Change request management (SUP.10)
Project management (MAN.3)
Most of the projects we are working have a capability of between Level 1 and Level 3. The Levels are (With my descriptions in parenthesis):
Level 0: Incomplete (You may perform many, but not all the required items)
Level 1: Performed (You do the all of the required items)
Level 2: Managed (You plan and do the required items)
Level 3: Established (You have a formal standard process established that you apply to all projects and you measure the performance)
Since to achieve a level 2 or 3 project planning and management is so important, we will discuss this first.
To achieve the intended process outcomes in this area, all work must be planned. There must be specific resources assigned and these resources must not be completely overloaded.
Many of the standard project management skills and tools are used to meet this requirement. Especially with software and other technical projects, the project management function is typically a responsibility of technical staff that have responsibilities for a significant portion of the tasks in a project. When a project management is overloaded, the first thing typically omitted is the project management activities which can drastically affect the project later.
There are many methods to address this challenge and we have specifically worked with several.
We have recently been experimenting with the SCRUM software development process, within the overall product development process driven by customer deliverables, with a great degree of success. We are finding resource and timing issues much earlier in the project, which allows for faster and more effective project adjustments. Additionally software bugs and testing issues are detected earlier.
The SCRUM process also breaks down the project into smaller “Bite” sized chucks which can be more easily managed.
However, there still has to be a focus, plan and measures toward the next deliverable and beyond. Without this, the resources may not be making progress at a rate to meet the required dates with the agreed software completion milestones. This key item must not be overlooked.
Here is a excerpt from an article about Windows 7. Do you see any of the SPICE process focus items as a reason for the improvements over the Vista project?
“Ballmer claims to have learned something from Vista: It's no longer advisable to try a "big bang" rollout — i.e., completely reimagine a product as sophisticated and interconnected as Windows.
So he hit control-alt-delete. He brought in a new taskmaster, Steven Sinofsky, to oversee the engineering. Sinofsky became known for hitting deadlines while overseeing the Office group from 2000–07. …..," he says. "What we did was [give] the development team a clarity that was probably missing." With Vista, teams worked on features simultaneously without an awareness of other schedules. When separate features came together, they were often incompatible. "The goal was to produce a plan for features, but not just a plan — also the motivation, the business rationale," the executive says.
The entire set of requirements in SPICE focuses on ensuring that the items mentioned, as well as others, are managed and successful.
Like many quality and management system requirements, this is one tool to help drive improvement. It must be established and implemented properly or the result is inefficiency with only a partial quality improvement.
The overall key in any process improvement project is to understand first what is working well within a group as well as the issues and challenges. The next step is to build on the strengths and address the weaknesses at the same time.
ISO 9001: 2008 Changes & Revisions (PPT)
Here is a PowerPoint presentation that details the changes to ISO 9001 from the 2000 revision to the 2008 Revision. It includes some implementation advice. Here is the link
http://tinyurl.com/yebsl8y
Labels
- CMMI (1)
- Complaince Evaluation (1)
- EMS (1)
- Environmental Management (2)
- General (2)
- ISO 14000 (1)
- ISO 14001 (1)
- ISO 15504 (1)
- ISO 9001: 2008 Quality Management System Requirements (2)
- Multitasking (1)
- Process Improvement (1)
- Project Management (1)
- SCRUM (1)
- SPICE (1)
- Time Management (1)
Archives
MSG Links
My Blog List
About this blog
Do you think an efficient process impoves your product?
About Me
- Brandon Kerkstra
- Grand Rapids, MI, United States
- I have worked with hundreds of companies in a wide range of industries during the past eight years as president of MSG. In addition to building a successful business, I have facilitated the implementation of ISO 17025, ISO 9001, ISO 14001, APQP, CMMI & SPICE. I have also trained on Project Management, Time Management and Lean Concepts, and more recently implemented and trained on AS 9100 and AS 9006 as well as DO178B requirements.